Assessment Year | 1996 |
---|---|
Principal Product | clamping sleeves,guide bushings |
NAICS |
n/a
|
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
67,700
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 5,148
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,074 | 1,166,471 |
kWh
|
$0.035 |
Electricity Demand | $43,267 | 3,634 |
kW-mo/yr
|
$11.91 |
Electricity Fees | $4,049 | - |
|
- |
Natural Gas | $4,875 | 1,241 |
MMBtu
|
$3.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,572 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,404 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $6,605 | $11,840 |
$3,566
111,665
kWh
|
$3,039
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,609 | $2,923 |
$798
24,912
kWh
|
$811
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $1,195 | $750 |
$564
17,585
kWh
|
$631
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $795 | $600 |
$555
17,292
kWh
|
$240
-
kW-mo/yr
|
- | |
05 | 2.4314: Use synthetic lubricant | $585 | $480 |
$395
12,309
kWh
|
$190
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $438 | $400 |
$296
9,379
kWh
|
$142
-
kW-mo/yr
|
- | |
07 | 3.4151: Minimize water usage | $345 | $800 | - | - |
$345
-
Tgal
|
|
TOTAL RECOMMENDED | $11,572 | $17,793 |
$6,174
193,142
kWh
|
$5,053
-
kW-mo/yr
|
$345
-
Tgal
|
||
TOTAL IMPLEMENTED | $2,404 | $3,523 |
$1,353
42,204
kWh
|
$1,051
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs