Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product corrugated shipping containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area 73,875
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,071 639,508
kWh
Electricity Demand $5,460 2,184
kW-mo/yr
Electricity Fees $1,847 -
Natural Gas $5,274 1,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,808 $375 $1,568
40,152
kWh
$240
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $1,366 $3,420 $1,246
31,946
kWh
$120
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $870 $40 $817
21,102
kWh
$53
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $656 $525 $586
15,240
kWh
$70
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $618 $500 - - $618
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $194 $300 $182
4,689
kWh
$12
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $130 $301 $119
3,224
kWh
$11
-
kW-mo/yr
- - -
08 3.4113: Treat and reuse rinse waters $13,620 $15,000 - - - $13,620
-
Tgal
-
09 3.6122: Install solid waste incinerator for heat $2,200 - - - - - $2,200
-
lb
TOTAL RECOMMENDED $21,462 $20,461 $4,518
116,353
kWh
$506
-
kW-mo/yr
$618
-
MMBtu
$13,620
-
Tgal
$2,200
-
lb
TOTAL IMPLEMENTED $4,116 $4,896 $3,115
80,011
kWh
$383
-
kW-mo/yr
$618
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs