Assessment Year | 1996 |
---|---|
Principal Product | corrugated shipping containers |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $5 M to 10M |
# of Employees | 47 |
Plant Area |
73,875
ft2
|
Annual Production | 100,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,071 | 639,508 |
kWh
|
$0.064 |
Electricity Demand | $5,460 | 2,184 |
kW-mo/yr
|
$2.50 |
Electricity Fees | $1,847 | - |
|
- |
Natural Gas | $5,274 | 1,504 |
MMBtu
|
$3.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,462 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,116 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,808 | $375 |
$1,568
40,152
kWh
|
$240
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,366 | $3,420 |
$1,246
31,946
kWh
|
$120
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $870 | $40 |
$817
21,102
kWh
|
$53
-
kW-mo/yr
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $656 | $525 |
$586
15,240
kWh
|
$70
-
kW-mo/yr
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $618 | $500 | - | - |
$618
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $194 | $300 |
$182
4,689
kWh
|
$12
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $130 | $301 |
$119
3,224
kWh
|
$11
-
kW-mo/yr
|
- | - | - | |
08 | 3.4113: Treat and reuse rinse waters | $13,620 | $15,000 | - | - | - |
$13,620
-
Tgal
|
- | |
09 | 3.6122: Install solid waste incinerator for heat | $2,200 | - | - | - | - | - |
$2,200
-
lb
|
|
TOTAL RECOMMENDED | $21,462 | $20,461 |
$4,518
116,353
kWh
|
$506
-
kW-mo/yr
|
$618
-
MMBtu
|
$13,620
-
Tgal
|
$2,200
-
lb
|
||
TOTAL IMPLEMENTED | $4,116 | $4,896 |
$3,115
80,011
kWh
|
$383
-
kW-mo/yr
|
$618
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs