| Assessment Year | 1996 |
|---|---|
| Principal Product | corrugated shipping containers |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $5 M to 10M |
| # of Employees | 47 |
| Plant Area |
73,875
ft2
|
| Annual Production | 100,000
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $41,071 | 639,508 |
kWh
|
$0.064 |
| Electricity Demand | $5,460 | 2,184 |
kW-mo/yr
|
$2.50 |
| Electricity Fees | $1,847 | - |
|
- |
| Natural Gas | $5,274 | 1,504 |
MMBtu
|
$3.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,462 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,116 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,808 | $375 |
$1,568
40,152
kWh
|
$240
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $1,366 | $3,420 |
$1,246
31,946
kWh
|
$120
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $870 | $40 |
$817
21,102
kWh
|
$53
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7135: Install occupancy sensors | $656 | $525 |
$586
15,240
kWh
|
$70
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $618 | $500 | - | - |
$618
-
MMBtu
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $194 | $300 |
$182
4,689
kWh
|
$12
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $130 | $301 |
$119
3,224
kWh
|
$11
-
kW-mo/yr
|
- | - | - | |
| 08 | 3.4113: Treat and reuse rinse waters | $13,620 | $15,000 | - | - | - |
$13,620
-
Tgal
|
- | |
| 09 | 3.6122: Install solid waste incinerator for heat | $2,200 | - | - | - | - | - |
$2,200
-
lb
|
|
| TOTAL RECOMMENDED | $21,462 | $20,461 |
$4,518
116,353
kWh
|
$506
-
kW-mo/yr
|
$618
-
MMBtu
|
$13,620
-
Tgal
|
$2,200
-
lb
|
||
| TOTAL IMPLEMENTED | $4,116 | $4,896 |
$3,115
80,011
kWh
|
$383
-
kW-mo/yr
|
$618
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs