Assessment Year | 1996 |
---|---|
Principal Product | Aluminum Castings |
NAICS |
n/a
|
SIC | 3365: Aluminum Foundries |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
60,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,678 | 1,460,727 |
kWh
|
$0.045 |
Electricity Demand | $9,912 | 4,166 |
kW-mo/yr
|
$2.38 |
Electricity Fees | $13,343 | - |
|
- |
Natural Gas | $114,580 | 30,644 |
MMBtu
|
$3.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,553 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,711 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $30,711 | $1,500 | - | - | - | $30,711 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,901 | $1,050 |
$1,706
56,858
kWh
|
$195
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,535 | $5,880 |
$1,251
41,618
kWh
|
$284
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $731 | $750 |
$616
20,516
kWh
|
$115
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $515 | $1,220 |
$416
13,775
kWh
|
$99
-
kW-mo/yr
|
- | - | |
06 | 3.5221: Recycle casting sand | $37,160 | $250,000 | - | - |
$37,160
-
lb
|
- | |
TOTAL RECOMMENDED | $72,553 | $260,400 |
$3,989
132,767
kWh
|
$693
-
kW-mo/yr
|
$37,160
-
lb
|
$30,711 | ||
TOTAL IMPLEMENTED | $30,711 | $1,500 | - | - | - | $30,711 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs