ITAC Assessment: BD0026
ITAC logo
ITAC Assessment: BD0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 63,000
ft2
Annual Production 75,000
thousand feet
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,757 296,307
kWh
Natural Gas $8,918 4,343
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,747

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,044 $3,180 $3,044
14,654
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,240 $730 $1,240
5,862
kWh
03 2.7111: Reduce illumination to minimum necessary levels $507 $20 $507
2,345
kWh
04 2.4221: Install compressor air intakes in coolest locations $212 $200 $212
1,172
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,388 $60 $2,388
11,430
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $265 $95 $265
1,172
kWh
TOTAL RECOMMENDED $7,656 $4,285 $7,656
36,635
kWh
TOTAL IMPLEMENTED $1,747 $750 $1,747
8,207
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs