ITAC Assessment: UL0108
ITAC logo
ITAC Assessment: UL0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Truck Trailers
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $50
M
to 100
M
# of Employees 475
Plant Area 420,000
ft2
Annual Production 3,350
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,273 2,815,651
kWh
Natural Gas $245,764 57,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $23,000 $1,300 n/a $23,000
347,011
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,112 $1,898 n/a $1,112
16,999
kWh
-
03 2.4133: Use most efficient type of electric motors $566 $1,200 n/a $566
8,499
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $22,623 $41,615 n/a $22,623
336,460
kWh
-
05 2.2426: Use waste heat from flue gases to heat space conditioning air $5,230 $7,000 n/a - $5,230
-
MMBtu
TOTAL RECOMMENDED $52,531 $53,013 $47,301
708,969
kWh
$5,230
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs