ITAC Assessment: BD0022
ITAC logo
ITAC Assessment: BD0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Boards & Fire Alarm Systems
NAICS
n/a
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 54,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,140 315,651
kWh
Natural Gas $17,273 2,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.4322: Use or replace with energy efficient substitutes $27,280 $700 - - $27,280
-
gal
02 2.6214: Shut off pilots in standby equipment $68 $20 - $68
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $709 $2,315 $709
7,620
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $22 $25 $22
293
kWh
- -
05 2.7135: Install occupancy sensors $555 $250 $555
6,155
kWh
- -
TOTAL RECOMMENDED $28,634 $3,310 $1,286
14,068
kWh
$68
-
MMBtu
$27,280
-
gal
TOTAL IMPLEMENTED $731 $2,340 $731
7,913
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs