| Assessment Year | 1984 |
|---|---|
| Principal Product | SPUN METAL PARTS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | n/a |
| # of Employees | 72 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $38,092 | 428,488 |
kWh
|
$0.089 |
| Natural Gas | $25,778 | 4,609 |
MMBtu
|
$5.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,455 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,951 | $16,300 |
$10,056
139,215
kWh
|
$(-105.0)
-
MMBtu
|
|
| 02 | 2.7492: Use proper thickness of insulation on building envelope | $14,140 | $29,400 | - |
$14,140
-
MMBtu
|
|
| 03 | 2.2212: Use minimum safe oven ventilation | $335 | $300 | - |
$335
-
MMBtu
|
|
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $169 | $200 |
$169
2,052
kWh
|
- | |
| TOTAL RECOMMENDED | $24,595 | $46,200 |
$10,225
141,267
kWh
|
$14,370
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,455 | $16,800 |
$10,225
141,267
kWh
|
$230
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs