ITAC Assessment: TS0001
ITAC logo
ITAC Assessment: TS0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product SPUN METAL PARTS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range n/a
# of Employees 72
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,092 428,488
kWh
Natural Gas $25,778 4,609
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,455

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,951 $16,300 $10,056
139,215
kWh
$(-105.0)
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $14,140 $29,400 - $14,140
-
MMBtu
03 2.2212: Use minimum safe oven ventilation $335 $300 - $335
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $169 $200 $169
2,052
kWh
-
TOTAL RECOMMENDED $24,595 $46,200 $10,225
141,267
kWh
$14,370
-
MMBtu
TOTAL IMPLEMENTED $10,455 $16,800 $10,225
141,267
kWh
$230
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs