ITAC Assessment: BD0019
ITAC logo
ITAC Assessment: BD0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Railroad Cars
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 87,900
ft2
Annual Production 1,250
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $421,842 5,234,467
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,486 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,269

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $591 $984 $591
7,327
kWh
02 2.7111: Reduce illumination to minimum necessary levels $3,496 $100 $3,496
43,376
kWh
03 2.4133: Use most efficient type of electric motors $2,217 $7,250 $2,217
27,550
kWh
04 2.4221: Install compressor air intakes in coolest locations $3,182 $1,500 $3,182
39,566
kWh
TOTAL RECOMMENDED $9,486 $9,834 $9,486
117,819
kWh
TOTAL IMPLEMENTED $7,269 $2,584 $7,269
90,269
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs