ITAC Assessment: BD0014
ITAC logo
ITAC Assessment: BD0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Paperboard
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 100,000
ft2
Annual Production 24,500
ton
Production Hrs. Annual 8,736
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,603 762,896
kWh
Natural Gas $829,708 289,333
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $240,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $206,117 $508,700 - $206,117
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,879 $7,000 $4,732
69,754
kWh
$(-853.0)
-
MMBtu
03 2.4133: Use most efficient type of electric motors $22,398 $33,500 $22,398
330,012
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,051 $20 $1,051
15,533
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,150 $500 $1,150
16,999
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,866 $2,342 $3,866
56,858
kWh
-
07 2.7135: Install occupancy sensors $2,169 $1,000 $2,169
31,946
kWh
-
TOTAL RECOMMENDED $240,630 $553,062 $35,366
521,102
kWh
$205,264
-
MMBtu
TOTAL IMPLEMENTED $28,465 $36,362 $28,465
419,402
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs