ITAC Assessment: BD0013
ITAC logo
ITAC Assessment: BD0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Printed Labels
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 390
Plant Area 295,000
ft2
Annual Production 6,000,000,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $427,155 9,116,647
kWh
Natural Gas $158,035 32,722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.4221: Install compressor air intakes in coolest locations $1,745 $2,250 $1,745
37,222
kWh
- -
02 2.2437: Recover waste heat from equipment $7,926 $100 - $7,926
-
MMBtu
-
03 3.4115: Recover and reuse cooling water $1,975 $5,000 - - $1,975
-
Tgal
04 2.4133: Use most efficient type of electric motors $7,553 $13,640 $7,553
161,196
kWh
- -
05 2.1222: Install turbulators $1,003 $2,400 - $1,003
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,835 $13,008 $11,835
252,638
kWh
- -
TOTAL RECOMMENDED $32,037 $36,398 $21,133
451,056
kWh
$8,929
-
MMBtu
$1,975
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs