ITAC Assessment: BD0012
ITAC logo
ITAC Assessment: BD0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Metal Stampings & Weldments
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 347,564
ft2
Annual Production 5,350
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,444 2,495,018
kWh
Natural Gas $123,995 24,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $35,731 $74,007 $35,731
562,720
kWh
- -
02 2.7135: Install occupancy sensors $501 $500 $501
7,913
kWh
- -
03 2.4133: Use most efficient type of electric motors $2,853 $6,580 $2,853
44,842
kWh
- -
04 2.8113: Purchase gas directly from a contract gas supplier $35,651 $1,500 - - $35,651
05 2.7491: Insulate glazing, walls, ceilings, and roofs $14,097 $25,600 - $14,097
-
MMBtu
-
06 2.2531: Re-size charging openings or add movable cover or door $9,068 $7,745 - $9,068
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $791 $500 $791
12,603
kWh
- -
TOTAL RECOMMENDED $98,692 $116,432 $39,876
628,078
kWh
$23,165
-
MMBtu
$35,651
TOTAL IMPLEMENTED $39,085 $81,087 $39,085
615,475
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs