ITAC Assessment: BD0003
ITAC logo
ITAC Assessment: BD0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Air Purifying Systems and Ductwork
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 21,945
ft2
Annual Production 150
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,386 50,410
kWh
Natural Gas $6,110 1,540
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $241 $596 $241
2,931
kWh
- -
02 2.4133: Use most efficient type of electric motors $243 $840 $243
2,931
kWh
- -
03 2.7444: Close holes and openings in building such as broken windows $1,799 $140 - $1,799
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $399 - - $399
-
MMBtu
-
05 2.6214: Shut off pilots in standby equipment $67 $20 - $67
-
MMBtu
-
06 2.6218: Turn off equipment when not in use $1,292 - $1,292
14,947
kWh
- -
07 2.8121: Apply for tax-free status for energy purchases $386 $250 - - $386
TOTAL RECOMMENDED $4,427 $1,846 $1,776
20,809
kWh
$2,265
-
MMBtu
$386
TOTAL IMPLEMENTED $3,876 $390 $1,292
14,947
kWh
$2,198
-
MMBtu
$386
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs