Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product WOOD PANELS & VENEER
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 227
Plant Area
n/a
Annual Production 11,250
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $377,426 6,748,828
kWh
Fuel Oil #2 $29,390 4,957
MMBtu
Wood $160,000 172,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,286

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Wood Savings
01 3.6123: Burn wood by-products for heat $22,310 $2,000 - $29,390
-
MMBtu
$(-7,080.0)
-
MMBtu
02 2.4133: Use most efficient type of electric motors $2,302 $2,745 $2,302
41,325
kWh
- -
03 2.4312: Improve lubrication practices $468 - $468
8,499
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,018 - $5,018
89,683
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,049 $525 $1,049
18,757
kWh
- -
06 2.3191: Use demand controller or load shedder $3,272 $3,000 $3,272
-
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $597 $200 $597
10,551
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $542 $500 $542
9,672
kWh
- -
TOTAL RECOMMENDED $35,558 $8,970 $13,248
178,487
kWh
$29,390
-
MMBtu
$(-7,080.0)
-
MMBtu
TOTAL IMPLEMENTED $32,286 $5,970 $9,976
178,487
kWh
$29,390
-
MMBtu
$(-7,080.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs