ITAC Assessment: AT0116
ITAC logo
ITAC Assessment: AT0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product WOOD TABLES
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $329,584 5,713,072
kWh
Fuel Oil #2 $8,663 2,100
MMBtu
Wood $73,600 73,599
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,158 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,158

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $807 $1,596 $807
14,068
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,045 $897 $3,045
52,755
kWh
03 2.3191: Use demand controller or load shedder $3,737 $3,000 $3,737
-
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,324 - $2,324
40,152
kWh
05 2.4312: Improve lubrication practices $434 - $434
7,620
kWh
06 2.6212: Turn off equipment during breaks, reduce operating time $2,351 $450 $2,351
40,739
kWh
07 2.4221: Install compressor air intakes in coolest locations $460 $500 $460
7,913
kWh
TOTAL RECOMMENDED $13,158 $6,443 $13,158
163,247
kWh
TOTAL IMPLEMENTED $13,158 $6,443 $13,158
163,247
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs