ITAC Assessment: AT0115
ITAC logo
ITAC Assessment: AT0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LARGE AIR HANDLING UNITS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 174
Plant Area
n/a
Annual Production 150
pieces
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,596 2,066,823
kWh
Natural Gas $32,371 6,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $492 $460 $492
8,499
kWh
- -
02 2.4312: Improve lubrication practices $553 - $553
9,379
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $492 - $492
8,499
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,754 $1,800 $31
586
kWh
$3,723
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,632 $5,260 $8,632
146,835
kWh
- -
06 2.2614: Use cooling tower or economizer to replace chiller cooling $9,919 $800 $288
4,982
kWh
- $9,631
07 2.2163: Use minimum steam operating pressure $978 $2,700 - $978
-
MMBtu
-
TOTAL RECOMMENDED $24,820 $11,020 $10,488
178,780
kWh
$4,701
-
MMBtu
$9,631
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs