ITAC Assessment: AT0110
ITAC logo
ITAC Assessment: AT0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MOTOR BRUSHES
NAICS
n/a
SIC 3624: Carbon and Graphite Products
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area
n/a
Annual Production 50,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,457 5,701,055
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,397

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $18,131 $5,540 $18,131
428,195
kWh
- -
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $25,785 $5,000 $25,785
609,027
kWh
- -
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,765 $3,500 $2,765
65,358
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,784 - $2,784
-
kWh
- -
05 2.7226: Use computer programs to optimize hvac performance $21,453 $21,000 $21,453
506,741
kWh
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,955 $33,000 $14,681
346,717
kWh
$(-8,726.0)
-
MMBtu
-
07 2.2437: Recover waste heat from equipment $32,558 $5,000 $4,253
100,234
kWh
- $28,305
08 2.4133: Use most efficient type of electric motors $378 $331 $378
9,086
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $705 $1,500 $705
16,706
kWh
- -
10 2.4312: Improve lubrication practices $994 - $994
23,447
kWh
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $622 - $622
14,654
kWh
- -
TOTAL RECOMMENDED $112,130 $74,871 $92,551
2,120,165
kWh
$(-8,726.0)
-
MMBtu
$28,305
TOTAL IMPLEMENTED $102,397 $41,871 $74,092
1,750,001
kWh
- $28,305
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs