| Assessment Year | 1988 |
|---|---|
| Principal Product | MOTOR BRUSHES |
| NAICS |
n/a
|
| SIC | 3624: Carbon and Graphite Products |
| Sales Range | $10 M to 50M |
| # of Employees | 270 |
| Plant Area |
n/a
|
| Annual Production | 50,000,000
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $241,457 | 5,701,055 |
kWh
|
$0.042 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $112,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $102,397 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $18,131 | $5,540 |
$18,131
428,195
kWh
|
- | - | |
| 02 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $25,785 | $5,000 |
$25,785
609,027
kWh
|
- | - | |
| 03 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,765 | $3,500 |
$2,765
65,358
kWh
|
- | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,784 | - |
$2,784
-
kWh
|
- | - | |
| 05 | 2.7226: Use computer programs to optimize hvac performance | $21,453 | $21,000 |
$21,453
506,741
kWh
|
- | - | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,955 | $33,000 |
$14,681
346,717
kWh
|
$(-8,726.0)
-
MMBtu
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $32,558 | $5,000 |
$4,253
100,234
kWh
|
- | $28,305 | |
| 08 | 2.4133: Use most efficient type of electric motors | $378 | $331 |
$378
9,086
kWh
|
- | - | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $705 | $1,500 |
$705
16,706
kWh
|
- | - | |
| 10 | 2.4312: Improve lubrication practices | $994 | - |
$994
23,447
kWh
|
- | - | |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $622 | - |
$622
14,654
kWh
|
- | - | |
| TOTAL RECOMMENDED | $112,130 | $74,871 |
$92,551
2,120,165
kWh
|
$(-8,726.0)
-
MMBtu
|
$28,305 | ||
| TOTAL IMPLEMENTED | $102,397 | $41,871 |
$74,092
1,750,001
kWh
|
- | $28,305 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs