Assessment Year | 2020 |
---|---|
Principal Product | Hardwood Flooring |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
178,580
ft2
|
Annual Production | 806,000
units
|
Production Hrs. Annual | 4,725
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $382,787 | 4,743,103 |
kWh
|
$0.081 |
Electricity Fees | $(-9,997.0) | - |
|
- |
Wood | $232,102 | 200,088 |
MMBtu
|
$1.16 |
TOTAL YEARLY COSTS | $604,892 | |||
RECOMMENDED SAVINGS* | $261,257 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,361 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $219,577 | $400 |
$248,548
3,079,747
kWh
|
$(-7,335.0) |
$(-21,636.0)
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $15,587 | $42,000 | - | - |
$15,587
-
MMBtu
|
- | |
03 | 4.454: Modify startup/shutdown times | $15,732 | $150 | - | $(-478.0) | - | $16,210 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,733 | $50 |
$4,877
60,442
kWh
|
$(-144.0) | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,464 | $2,170 |
$3,569
44,228
kWh
|
$(-105.0) | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,164 | $309 |
$2,230
27,634
kWh
|
$(-66.0) | - | - | |
TOTAL RECOMMENDED | $261,257 | $45,079 |
$259,224
3,212,051
kWh
|
$(-8,128.0) |
$(-6,049.0)
-
MMBtu
|
$16,210 | ||
TOTAL IMPLEMENTED | $10,361 | $2,529 |
$10,676
132,304
kWh
|
$(-315.0) | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs