ITAC Assessment: AT0096
ITAC logo
ITAC Assessment: AT0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product VALVES FOR AUTO INDUSTRY
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 65,000,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $472,326 8,228,019
kWh
Natural Gas $137,293 32,768
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,689

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $47,649 $18,500 $2,133
37,222
kWh
- $45,516
02 2.7123: Keep lamps and reflectors clean $6,328 $7,000 $6,328
110,199
kWh
- -
03 2.4133: Use most efficient type of electric motors $1,633 $1,297 $1,633
28,429
kWh
- -
04 2.4312: Improve lubrication practices $1,683 - $1,683
29,308
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,501 - $2,501
43,669
kWh
- -
06 2.2136: Install / repair insulation on steam lines $367 $250 - $367
-
MMBtu
-
07 2.2122: Install / repair insulation on condensate lines $1,050 $600 - $1,050
-
MMBtu
-
08 2.6214: Shut off pilots in standby equipment $376 - - $506
-
MMBtu
$(-130.0)
09 2.4221: Install compressor air intakes in coolest locations $1,785 $2,500 $1,785
31,067
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $824 $100 $824
14,361
kWh
- -
TOTAL RECOMMENDED $64,196 $30,247 $16,887
294,255
kWh
$1,923
-
MMBtu
$45,386
TOTAL IMPLEMENTED $61,689 $30,147 $14,380
250,586
kWh
$1,923
-
MMBtu
$45,386
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs