ITAC Assessment: AT0090
ITAC logo
ITAC Assessment: AT0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product DECORATED METAL PLATES
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 135
Plant Area
n/a
Annual Production 30,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,113 1,665,006
kWh
Natural Gas $65,714 10,984
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,379

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,171 $912 $6,171
66,823
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $18,740 $23,750 $18,740
202,521
kWh
-
03 2.4133: Use most efficient type of electric motors $361 $335 $361
3,810
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $659 - $659
7,034
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $429 $500 $429
4,689
kWh
-
06 2.2511: Insulate bare equipment $1,997 $4,900 - $1,997
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,930 $19,000 $8,190
88,511
kWh
$(-2,260.0)
-
MMBtu
TOTAL RECOMMENDED $34,287 $49,397 $34,550
373,388
kWh
$(-263.0)
-
MMBtu
TOTAL IMPLEMENTED $7,379 $19,835 $9,639
104,044
kWh
$(-2,260.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs