ITAC Assessment: AT0084
ITAC logo
ITAC Assessment: AT0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COTTON FABRIC
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $352,164 7,628,077
kWh
Natural Gas $555,723 205,295
MMBtu
Fuel Oil #2 $32,171 7,798
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $31,324 $10,000 - $31,324
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $10,654 $12,000 - $10,654
-
MMBtu
03 2.2531: Re-size charging openings or add movable cover or door $22,702 $5,000 - $22,702
-
MMBtu
04 2.2121: Increase amount of condensate returned $9,822 $1,000 - $9,822
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $6,988 $6,000 - $6,988
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,220 $865 $5,220
112,837
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,813 $22,500 $5,813
126,026
kWh
-
08 2.4133: Use most efficient type of electric motors $2,139 $1,152 $2,139
46,307
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $697 $800 $697
15,240
kWh
-
10 2.2437: Recover waste heat from equipment $1,297 $3,000 $1,297
145,662
kWh
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,708 - $2,708
58,617
kWh
-
12 2.7226: Use computer programs to optimize hvac performance $1,734 $1,500 $1,734
37,515
kWh
-
TOTAL RECOMMENDED $101,098 $63,817 $19,608
542,204
kWh
$81,490
-
MMBtu
TOTAL IMPLEMENTED $44,641 $46,517 $17,177
489,449
kWh
$27,464
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs