Assessment Year | 1987 |
---|---|
Principal Product | PAPER TISSUE & EGG CARTONS |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $5 M to 10M |
# of Employees | 98 |
Plant Area |
n/a
|
Annual Production | 13,200
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $669,055 | 13,902,990 |
kWh
|
$0.048 |
Natural Gas | $582,592 | 128,655 |
MMBtu
|
$4.53 |
Fuel Oil #2 | $128,857 | 35,214 |
MMBtu
|
$3.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $275,306 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,896 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $255,410 | $1,000,000 |
$415,663
8,640,094
kWh
|
$(-160,253.0)
-
MMBtu
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $966 | $1,074 |
$966
20,223
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,541 | - |
$1,541
31,946
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,062 | $2,365 |
$1,062
21,981
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $815 | $1,800 |
$815
16,999
kWh
|
- | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $9,252 | $6,000 | - |
$9,252
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,796 | $6,000 | - |
$3,955
-
MMBtu
|
$1,841
-
MMBtu
|
|
08 | 2.2122: Install / repair insulation on condensate lines | $464 | $240 | - |
$317
-
MMBtu
|
$147
-
MMBtu
|
|
TOTAL RECOMMENDED | $275,306 | $1,017,479 |
$420,047
8,731,243
kWh
|
$(-146,729.0)
-
MMBtu
|
$1,988
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,896 | $17,479 |
$4,384
91,149
kWh
|
$13,524
-
MMBtu
|
$1,988
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs