ITAC Assessment: AT0081
ITAC logo
ITAC Assessment: AT0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PAPER TISSUE & EGG CARTONS
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $5
M
to 10
M
# of Employees 98
Plant Area
n/a
Annual Production 13,200
ton
Production Hrs. Annual 8,736
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $669,055 13,902,990
kWh
Natural Gas $582,592 128,655
MMBtu
Fuel Oil #2 $128,857 35,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $275,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $255,410 $1,000,000 $415,663
8,640,094
kWh
$(-160,253.0)
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $966 $1,074 $966
20,223
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,541 - $1,541
31,946
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,062 $2,365 $1,062
21,981
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $815 $1,800 $815
16,999
kWh
- -
06 2.2414: Use waste heat from hot flue gases to preheat $9,252 $6,000 - $9,252
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $5,796 $6,000 - $3,955
-
MMBtu
$1,841
-
MMBtu
08 2.2122: Install / repair insulation on condensate lines $464 $240 - $317
-
MMBtu
$147
-
MMBtu
TOTAL RECOMMENDED $275,306 $1,017,479 $420,047
8,731,243
kWh
$(-146,729.0)
-
MMBtu
$1,988
-
MMBtu
TOTAL IMPLEMENTED $19,896 $17,479 $4,384
91,149
kWh
$13,524
-
MMBtu
$1,988
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs