ITAC Assessment: AT0080
ITAC logo
ITAC Assessment: AT0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COMMERCIAL PRINTING
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 175
Plant Area
n/a
Annual Production 900
ton
Production Hrs. Annual 7,488
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,967 1,089,390
kWh
Natural Gas $8,946 1,526
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,322 $3,350 $4,322
72,392
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,105 $2,000 $1,783
29,894
kWh
$(-678.0)
-
MMBtu
03 2.4133: Use most efficient type of electric motors $137 $118 $137
2,345
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $255 - $255
4,396
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $145 $150 $145
2,345
kWh
-
TOTAL RECOMMENDED $5,964 $5,618 $6,642
111,372
kWh
$(-678.0)
-
MMBtu
TOTAL IMPLEMENTED $5,964 $5,618 $6,642
111,372
kWh
$(-678.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs