Assessment Year | 1987 |
---|---|
Principal Product | PLASTIC MOLDINGS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
n/a
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $697,762 | 16,165,006 |
kWh
|
$0.043 |
Natural Gas | $17,905 | 3,085 |
MMBtu
|
$5.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,363 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,323 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $21,967 | $6,000 |
$21,967
509,086
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,236 | $18,150 |
$7,236
167,644
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $6,123 | $5,000 |
$6,123
141,852
kWh
|
- | - | |
04 | 2.7226: Use computer programs to optimize hvac performance | $1,341 | $1,500 |
$1,341
31,067
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,132 | $3,000 |
$1,132
26,377
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $2,941 | $2,400 | - |
$2,941
-
MMBtu
|
- | |
07 | 2.6214: Shut off pilots in standby equipment | $339 | - | - |
$389
-
MMBtu
|
$(-50.0) | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,284 | - |
$2,284
53,048
kWh
|
- | - | |
TOTAL RECOMMENDED | $43,363 | $36,050 |
$40,083
929,074
kWh
|
$3,330
-
MMBtu
|
$(-50.0) | ||
TOTAL IMPLEMENTED | $17,323 | $24,650 |
$16,984
393,611
kWh
|
$389
-
MMBtu
|
$(-50.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs