Assessment Year | 1987 |
---|---|
Principal Product | METAL & WOOD FURNITURE |
NAICS |
n/a
|
SIC | 2519: Household Furniture, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
n/a
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $173,150 | 2,662,954 |
kWh
|
$0.065 |
Natural Gas | $39,134 | 6,537 |
MMBtu
|
$5.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,108 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,108 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $41,275 | $40,000 |
$68,008
1,046,307
kWh
|
$(-26,733.0)
-
MMBtu
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $325 | $392 |
$325
4,982
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $379 | - |
$379
5,862
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $6,666 | $1,500 | - |
$6,666
-
MMBtu
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,128 | - | - |
$1,428
-
MMBtu
|
$(-300.0) | |
06 | 2.2511: Insulate bare equipment | $1,583 | $150 |
$1,810
27,843
kWh
|
$(-227.0)
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $540 | $845 |
$540
8,206
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $212 | $150 |
$212
3,224
kWh
|
- | - | |
TOTAL RECOMMENDED | $52,108 | $43,037 |
$71,274
1,096,424
kWh
|
$(-18,866.0)
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | $52,108 | $43,037 |
$71,274
1,096,424
kWh
|
$(-18,866.0)
-
MMBtu
|
$(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs