ITAC Assessment: TP0012
ITAC logo
ITAC Assessment: TP0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Metal Plant Hopers
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 638
pieces
Production Hrs. Annual 4,709
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,598 1,435,522
kWh
Electricity Demand $34,784 5,568
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,884 - n/a - $19,884
-
kW-mo/yr
02 2.3212: Optimize plant power factor $992 $1,750 n/a - $992
-
kW-mo/yr
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,665 $9,759 n/a $4,665
149,472
kWh
-
04 2.7135: Install occupancy sensors $3,468 $1,720 n/a $3,468
92,028
kWh
-
05 2.7124: Make a practice of turning off lights when not needed $1,241 - n/a $1,241
39,859
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,115 $35 n/a $707
22,567
kWh
$408
-
kW-mo/yr
07 2.7124: Make a practice of turning off lights when not needed $550 $176 n/a $320
10,258
kWh
$230
-
kW-mo/yr
08 2.4133: Use most efficient type of electric motors $430 $1,186 n/a $272
8,792
kWh
$158
-
kW-mo/yr
09 2.4314: Use synthetic lubricant $218 - n/a $138
4,396
kWh
$80
-
kW-mo/yr
10 2.7142: Utilize higher efficiency lamps and/or ballasts $118 $290 n/a $73
2,052
kWh
$45
-
kW-mo/yr
TOTAL RECOMMENDED $32,681 $14,916 $10,884
329,424
kWh
$21,797
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs