| Assessment Year | 1986 |
|---|---|
| Principal Product | PVC PLASTIC MOLDINGS |
| NAICS |
n/a
|
| SIC | 3498: Fabricated Pipe and Pipe Fittings |
| Sales Range | $1 M to 5M |
| # of Employees | 67 |
| Plant Area |
n/a
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $56,620 | 980,363 |
kWh
|
$0.058 |
| Natural Gas | $4,136 | 620 |
MMBtu
|
$6.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,466 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,763 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $1,676 | $200 |
$1,676
29,015
kWh
|
- | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,183 | - |
$4,317
74,736
kWh
|
$(-2,134.0)
-
MMBtu
|
|
| 03 | 2.7226: Use computer programs to optimize hvac performance | $2,928 | $1,200 |
$2,928
50,703
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $520 | $300 | - |
$520
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $159 | $280 |
$159
2,638
kWh
|
- | |
| TOTAL RECOMMENDED | $7,466 | $1,980 |
$9,080
157,092
kWh
|
$(-1,614.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,763 | $1,680 |
$4,763
82,356
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs