ITAC Assessment: AT0058
ITAC logo
ITAC Assessment: AT0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PVC PLASTIC MOLDINGS
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $1
M
to 5
M
# of Employees 67
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,620 980,363
kWh
Natural Gas $4,136 620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,763

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2514: Cover open tanks $1,676 $200 $1,676
29,015
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,183 - $4,317
74,736
kWh
$(-2,134.0)
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $2,928 $1,200 $2,928
50,703
kWh
-
04 2.2437: Recover waste heat from equipment $520 $300 - $520
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $159 $280 $159
2,638
kWh
-
TOTAL RECOMMENDED $7,466 $1,980 $9,080
157,092
kWh
$(-1,614.0)
-
MMBtu
TOTAL IMPLEMENTED $4,763 $1,680 $4,763
82,356
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs