ITAC Assessment: AT0057
ITAC logo
ITAC Assessment: AT0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product X-RAY VIEWING EQUIPMENT
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area
n/a
Annual Production 120
pieces
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,586 1,028,136
kWh
Natural Gas $101,762 18,359
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $355 $250 $355
5,569
kWh
- -
02 2.4312: Improve lubrication practices $299 - $449
7,034
kWh
- $(-150.0)
03 2.7226: Use computer programs to optimize hvac performance $972 $1,500 $972
15,240
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $187 - $187
2,931
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $453 - - $753
-
MMBtu
$(-300.0)
06 2.2514: Cover open tanks $5,222 $300 $5,222
81,770
kWh
- -
07 2.2511: Insulate bare equipment $1,261 $250 $1,477
23,154
kWh
$(-216.0)
-
MMBtu
-
TOTAL RECOMMENDED $8,749 $2,300 $8,662
135,698
kWh
$537
-
MMBtu
$(-450.0)
TOTAL IMPLEMENTED $1,911 $1,500 $1,608
25,205
kWh
$753
-
MMBtu
$(-450.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs