| Assessment Year | 1986 |
|---|---|
| Principal Product | X-RAY VIEWING EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 80 |
| Plant Area |
n/a
|
| Annual Production | 120
pieces
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,586 | 1,028,136 |
kWh
|
$0.064 |
| Natural Gas | $101,762 | 18,359 |
MMBtu
|
$5.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,749 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,911 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $355 | $250 |
$355
5,569
kWh
|
- | - | |
| 02 | 2.4312: Improve lubrication practices | $299 | - |
$449
7,034
kWh
|
- | $(-150.0) | |
| 03 | 2.7226: Use computer programs to optimize hvac performance | $972 | $1,500 |
$972
15,240
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $187 | - |
$187
2,931
kWh
|
- | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $453 | - | - |
$753
-
MMBtu
|
$(-300.0) | |
| 06 | 2.2514: Cover open tanks | $5,222 | $300 |
$5,222
81,770
kWh
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $1,261 | $250 |
$1,477
23,154
kWh
|
$(-216.0)
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $8,749 | $2,300 |
$8,662
135,698
kWh
|
$537
-
MMBtu
|
$(-450.0) | ||
| TOTAL IMPLEMENTED | $1,911 | $1,500 |
$1,608
25,205
kWh
|
$753
-
MMBtu
|
$(-450.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs