| Assessment Year | 1986 |
|---|---|
| Principal Product | METAL CABINETS |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $838,611 | 18,210,141 |
kWh
|
$0.046 |
| Natural Gas | $31,415 | 4,858 |
MMBtu
|
$6.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,523 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $820 | $986 |
$820
17,878
kWh
|
- | - | |
| 02 | 2.4312: Improve lubrication practices | $4,453 | - |
$6,953
150,938
kWh
|
- | $(-2,500.0) | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,134 | - |
$1,134
24,619
kWh
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,066 | $150 |
$1,066
23,154
kWh
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,521 | - |
$1,521
32,825
kWh
|
- | - | |
| 06 | 2.2514: Cover open tanks | $7,949 | $1,850 | - |
$7,949
-
MMBtu
|
- | |
| 07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $644 | $500 | - |
$644
-
MMBtu
|
- | |
| 08 | 2.2136: Install / repair insulation on steam lines | $122 | $150 | - |
$122
-
MMBtu
|
- | |
| 09 | 2.2437: Recover waste heat from equipment | $2,814 | $1,500 | - |
$2,814
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $20,523 | $5,136 |
$11,494
249,414
kWh
|
$11,529
-
MMBtu
|
$(-2,500.0) | ||
| TOTAL IMPLEMENTED | $20,523 | $5,136 |
$11,494
249,414
kWh
|
$11,529
-
MMBtu
|
$(-2,500.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs