ITAC Assessment: AT0054
ITAC logo
ITAC Assessment: AT0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product METAL CABINETS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $838,611 18,210,141
kWh
Natural Gas $31,415 4,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $820 $986 $820
17,878
kWh
- -
02 2.4312: Improve lubrication practices $4,453 - $6,953
150,938
kWh
- $(-2,500.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,134 - $1,134
24,619
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,066 $150 $1,066
23,154
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,521 - $1,521
32,825
kWh
- -
06 2.2514: Cover open tanks $7,949 $1,850 - $7,949
-
MMBtu
-
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $644 $500 - $644
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $122 $150 - $122
-
MMBtu
-
09 2.2437: Recover waste heat from equipment $2,814 $1,500 - $2,814
-
MMBtu
-
TOTAL RECOMMENDED $20,523 $5,136 $11,494
249,414
kWh
$11,529
-
MMBtu
$(-2,500.0)
TOTAL IMPLEMENTED $20,523 $5,136 $11,494
249,414
kWh
$11,529
-
MMBtu
$(-2,500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs