ITAC Assessment: AT0053
ITAC logo
ITAC Assessment: AT0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PLASTIC CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 730,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $872,742 18,393,025
kWh
Natural Gas $61,196 11,652
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $3,839 $1,967 $3,839
80,891
kWh
- -
02 2.7226: Use computer programs to optimize hvac performance $7,692 $800 $7,692
162,075
kWh
- -
03 2.2437: Recover waste heat from equipment $25,442 $5,000 - $25,442
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $15,065 $2,000 $15,065
317,409
kWh
- -
05 2.4312: Improve lubrication practices $35,749 - $39,449
831,184
kWh
- $(-3,700.0)
TOTAL RECOMMENDED $87,787 $9,767 $66,045
1,391,559
kWh
$25,442
-
MMBtu
$(-3,700.0)
TOTAL IMPLEMENTED $87,787 $9,767 $66,045
1,391,559
kWh
$25,442
-
MMBtu
$(-3,700.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs