ITAC Assessment: AT0047
ITAC logo
ITAC Assessment: AT0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product POLYURETHANE
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,764 1,634,525
kWh
Fuel Oil #2 $19,480 3,878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,326 $928 $1,326
21,981
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $147 $180 $147
2,345
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,480 $6,000 $4,480
72,098
kWh
04 2.4221: Install compressor air intakes in coolest locations $451 $150 $451
7,620
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,350 $1,308 $2,350
39,273
kWh
TOTAL RECOMMENDED $8,754 $8,566 $8,754
143,317
kWh
TOTAL IMPLEMENTED $8,303 $8,416 $8,303
135,697
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs