ITAC Assessment: AT0034
ITAC logo
ITAC Assessment: AT0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product WHIPPED CREAM, ETC.
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 52,000,000
lb
Production Hrs. Annual 4,576
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,204 1,842,907
kWh
Natural Gas $81,450 13,523
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,142

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $264 $195 $264
5,275
kWh
-
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $4,201 $2,000 - $4,201
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $2,806 $900 - $2,806
-
MMBtu
04 2.2437: Recover waste heat from equipment $1,213 $1,000 - $1,213
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $303 $50 $303
6,155
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $268 $250 $268
5,275
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $90 $163 $90
1,758
kWh
-
08 2.2121: Increase amount of condensate returned $4,997 $5,000 - $4,997
-
MMBtu
TOTAL RECOMMENDED $14,142 $9,558 $925
18,463
kWh
$13,217
-
MMBtu
TOTAL IMPLEMENTED $14,142 $9,558 $925
18,463
kWh
$13,217
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs