ITAC Assessment: MA0683
ITAC logo
ITAC Assessment: MA0683
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Extruded and coated film
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 85,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $414,819 4,085,550
kWh
Electricity Demand $46,565 11,879
kW-mo/yr
Electricity Fees $2,400 -
Natural Gas $138,902 16,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $24,679 $50,000 - $24,679
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,021 $2,800 $12,021
118,441
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $1,273 $200 - $1,273
-
MMBtu
04 2.7311: Ventilation system to shut off when room is not in use $1,113 $200 $809
7,978
kWh
$304
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $821 $200 $821
8,093
kWh
-
06 2.7124: Make a practice of turning off lights when not needed $486 $100 $486
4,792
kWh
-
TOTAL RECOMMENDED $40,393 $53,500 $14,137
139,304
kWh
$26,256
-
MMBtu
TOTAL IMPLEMENTED $15,714 $3,500 $14,137
139,304
kWh
$1,577
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs