ITAC Assessment: AT0033
ITAC logo
ITAC Assessment: AT0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product AIRPLANE SEATS(COMMERCIAL)
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 28,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,467 5,533,118
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $587 $332 $587
11,723
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $245 $360 $245
4,982
kWh
03 2.4221: Install compressor air intakes in coolest locations $652 $250 $652
12,896
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $958 - $958
19,050
kWh
TOTAL RECOMMENDED $2,442 $942 $2,442
48,651
kWh
TOTAL IMPLEMENTED $897 $610 $897
17,878
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs