Assessment Year | 2011 |
---|---|
Principal Product | milk |
NAICS | 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 252 |
Plant Area |
40,000
ft2
|
Annual Production | 22,000
Tgal
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $563,247 | 7,634,800 |
kWh
|
$0.074 |
Natural Gas | $107,126 | 15,930 |
MMBtu
|
$6.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,543 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $35,965 | $89,664 | - |
$19,443
-
MMBtu
|
$16,522
-
Tgal
|
- | |
02 | 2.2511: Insulate bare equipment | $9,420 | $840 |
$9,420
126,021
kWh
|
- | - | - | |
03 | 2.2441: Preheat boiler makeup water with waste process heat | $8,884 | $30,300 | - |
$8,884
-
MMBtu
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,032 | $30 |
$7,032
94,072
kWh
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $6,412 | $1,127 | - |
$6,412
-
MMBtu
|
- | - | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $5,817 | $1,291 | - | - | - | $5,817 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,939 | $5,460 |
$1,939
25,937
kWh
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,666 | $360 |
$1,666
22,286
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $717 | $455 |
$323
4,316
kWh
|
- | - | $394 | |
10 | 2.6211: Conserve energy by efficient use of vending machines | $261 | $375 |
$261
3,495
kWh
|
- | - | - | |
11 | 2.7135: Install occupancy sensors | $256 | $480 |
$256
3,423
kWh
|
- | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $158 | $65 |
$158
2,114
kWh
|
- | - | - | |
13 | 2.7224: Reduce space conditioning during non-working hours | $80 | $66 |
$80
1,075
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $78,607 | $130,513 |
$21,135
282,739
kWh
|
$34,739
-
MMBtu
|
$16,522
-
Tgal
|
$6,211 | ||
TOTAL IMPLEMENTED | $53,543 | $92,057 |
$11,166
149,382
kWh
|
$25,855
-
MMBtu
|
$16,522
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs