Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product milk
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 252
Plant Area 40,000
ft2
Annual Production 22,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $563,247 7,634,800
kWh
Natural Gas $107,126 15,930
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.2121: Increase amount of condensate returned $35,965 $89,664 - $19,443
-
MMBtu
$16,522
-
Tgal
-
02 2.2511: Insulate bare equipment $9,420 $840 $9,420
126,021
kWh
- - -
03 2.2441: Preheat boiler makeup water with waste process heat $8,884 $30,300 - $8,884
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,032 $30 $7,032
94,072
kWh
- - -
05 2.2511: Insulate bare equipment $6,412 $1,127 - $6,412
-
MMBtu
- -
06 4.611: Begin a practice of predictive / preventative maintenance $5,817 $1,291 - - - $5,817
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,939 $5,460 $1,939
25,937
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,666 $360 $1,666
22,286
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $717 $455 $323
4,316
kWh
- - $394
10 2.6211: Conserve energy by efficient use of vending machines $261 $375 $261
3,495
kWh
- - -
11 2.7135: Install occupancy sensors $256 $480 $256
3,423
kWh
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $158 $65 $158
2,114
kWh
- - -
13 2.7224: Reduce space conditioning during non-working hours $80 $66 $80
1,075
kWh
- - -
TOTAL RECOMMENDED $78,607 $130,513 $21,135
282,739
kWh
$34,739
-
MMBtu
$16,522
-
Tgal
$6,211
TOTAL IMPLEMENTED $53,543 $92,057 $11,166
149,382
kWh
$25,855
-
MMBtu
$16,522
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs