| Assessment Year | 1985 |
|---|---|
| Principal Product | LACQUER,SEALERS,ENAMEL |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 6,000
Tgal
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $122,937 | 2,399,766 |
kWh
|
$0.051 |
| Natural Gas | $69,549 | 13,952 |
MMBtu
|
$4.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,431 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,431 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,538 | $3,544 |
$1,538
30,188
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,391 | $300 | - |
$1,391
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $8,375 | $3,000 | - |
$8,375
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,049 | $825 |
$1,049
20,516
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,312 | $465 |
$1,312
25,498
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $859 | $720 |
$859
16,706
kWh
|
- | |
| 07 | 2.7226: Use computer programs to optimize hvac performance | $6,603 | $2,700 |
$6,603
128,957
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $304 | $400 |
$304
5,862
kWh
|
- | |
| TOTAL RECOMMENDED | $21,431 | $11,954 |
$11,665
227,727
kWh
|
$9,766
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $21,431 | $11,954 |
$11,665
227,727
kWh
|
$9,766
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs