ITAC Assessment: AT0032
ITAC logo
ITAC Assessment: AT0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product LACQUER,SEALERS,ENAMEL
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 6,000
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,937 2,399,766
kWh
Natural Gas $69,549 13,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,431

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,538 $3,544 $1,538
30,188
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,391 $300 - $1,391
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $8,375 $3,000 - $8,375
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,049 $825 $1,049
20,516
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,312 $465 $1,312
25,498
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $859 $720 $859
16,706
kWh
-
07 2.7226: Use computer programs to optimize hvac performance $6,603 $2,700 $6,603
128,957
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $304 $400 $304
5,862
kWh
-
TOTAL RECOMMENDED $21,431 $11,954 $11,665
227,727
kWh
$9,766
-
MMBtu
TOTAL IMPLEMENTED $21,431 $11,954 $11,665
227,727
kWh
$9,766
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs