ITAC Assessment: AT0028
ITAC logo
ITAC Assessment: AT0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product HEALTH CARE PRODUCTS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,820 9,707,503
kWh
Natural Gas $262,453 49,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,104 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,528

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $591 $818 $591
13,189
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,845 $361 $1,845
41,032
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $825 - $825
18,464
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $576 $750 $576
12,896
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,958 $2,993 $1,958
43,376
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $15,759 $300 - $15,759
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $550 $900 $550
12,309
kWh
-
TOTAL RECOMMENDED $22,104 $6,122 $6,345
141,266
kWh
$15,759
-
MMBtu
TOTAL IMPLEMENTED $21,528 $5,372 $5,769
128,370
kWh
$15,759
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs