Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ALUMINUM DIE CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 8,000,000
ton
Production Hrs. Annual 6,120
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,889 3,681,125
kWh
Natural Gas $390,188 72,080
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $4,589 $3,535 $4,589
99,648
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $243 $36 $243
5,275
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,082 $933 $1,082
23,447
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,476 - $1,476
32,239
kWh
05 2.4221: Install compressor air intakes in coolest locations $820 $500 $820
17,878
kWh
TOTAL RECOMMENDED $8,210 $5,004 $8,210
178,487
kWh
TOTAL IMPLEMENTED $2,145 $1,469 $2,145
46,600
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs