ITAC Assessment: WI0230
ITAC logo
ITAC Assessment: WI0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product application tapes
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 60,000
ft2
Annual Production 216,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,940 3,098,769
kWh
Natural Gas $144,866 41,622
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $12,947 - - - $12,947
02 2.7221: Lower temperature during the winter season and vice-versa $3,633 - - $3,633
-
MMBtu
-
03 2.2511: Insulate bare equipment $2,042 $2,089 - $2,042
-
MMBtu
-
04 2.2511: Insulate bare equipment $442 $585 - $442
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,124 $500 - $1,124
-
MMBtu
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,111 - $1,111
-
kWh
- -
07 2.3132: Recharge batteries on during off-peak demand periods $1,098 - $1,098
-
kWh
- -
TOTAL RECOMMENDED $22,397 $3,174 $2,209
-
kWh
$7,241
-
MMBtu
$12,947
TOTAL IMPLEMENTED $8,339 $3,174 $1,098
-
kWh
$7,241
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs