ITAC Assessment: AT0014
ITAC logo
ITAC Assessment: AT0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product LACQUER PRODUCTS
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 44
Plant Area
n/a
Annual Production 2,000
Tgal
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,188 1,170,868
kWh
Natural Gas $26,732 4,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,879

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $604 $1,562 $604
11,723
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,661 $300 - $1,661
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $384 - $384
7,620
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $253 $750 $253
4,982
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,130 $182 $1,130
21,981
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,847 $2,808 $5,847
113,716
kWh
-
TOTAL RECOMMENDED $9,879 $5,602 $8,218
160,022
kWh
$1,661
-
MMBtu
TOTAL IMPLEMENTED $9,879 $5,602 $8,218
160,022
kWh
$1,661
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs