Assessment Year | 1985 |
---|---|
Principal Product | LACQUER PRODUCTS |
NAICS |
n/a
|
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 44 |
Plant Area |
n/a
|
Annual Production | 2,000
Tgal
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,188 | 1,170,868 |
kWh
|
$0.051 |
Natural Gas | $26,732 | 4,542 |
MMBtu
|
$5.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,879 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,879 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $604 | $1,562 |
$604
11,723
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,661 | $300 | - |
$1,661
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $384 | - |
$384
7,620
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $253 | $750 |
$253
4,982
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,130 | $182 |
$1,130
21,981
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,847 | $2,808 |
$5,847
113,716
kWh
|
- | |
TOTAL RECOMMENDED | $9,879 | $5,602 |
$8,218
160,022
kWh
|
$1,661
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,879 | $5,602 |
$8,218
160,022
kWh
|
$1,661
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs