Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product UPHOLSTRY FABRIC TREATMENT
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 160
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,006 3,893,904
kWh
Natural Gas $394,700 71,423
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,288

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,849 $2,615 $2,849
63,306
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $21,328 $300 - $21,328
-
MMBtu
03 2.7261: Install timers and/or thermostats $38,836 $2,500 - $38,836
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $25,352 $17,610 - $25,352
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,759 $13,543 $6,759
150,352
kWh
-
TOTAL RECOMMENDED $95,124 $36,568 $9,608
213,658
kWh
$85,516
-
MMBtu
TOTAL IMPLEMENTED $56,288 $34,068 $9,608
213,658
kWh
$46,680
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs