ITAC Assessment: TT0205
ITAC logo
ITAC Assessment: TT0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product engines
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range greater than $500
M
# of Employees 2,000
Plant Area 1,130,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,004,079 165,117,994
kWh
Electricity Demand $3,349,574 621,158
kW-mo/yr
Natural Gas $525,576 110,121
MMBtu
Waste Disposal Costs
Water Usage $369,044 78,111
Tgal
Water Disposal $460,521 78,111
Tgal
TOTAL YEARLY COSTS $10,708,794
RECOMMENDED SAVINGS* $855,318 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $376,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $376,439 $20 $312,927
8,596,894
kWh
$63,512
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $376,439 $1,600 $312,927
8,596,894
kWh
$63,512
-
kW-mo/yr
-
03 3.4155: Meter waste water $30,463 $1,000 - - $30,463
-
Tgal
04 2.3212: Optimize plant power factor $28,188 $132,000 - $28,188
-
kW-mo/yr
-
05 2.6212: Turn off equipment during breaks, reduce operating time $19,941 $160 $19,941
547,836
kWh
- -
06 2.4113: Install motor voltage controller on lightly loaded motors $9,911 $10,800 $8,164
226,800
kWh
$1,747
-
kW-mo/yr
-
07 2.7425: Clean or color roof to reduce solar load $8,761 $8,362 $3,053
83,880
kWh
$5,708
-
kW-mo/yr
-
08 2.4113: Install motor voltage controller on lightly loaded motors $5,176 $6,900 $4,264
118,440
kWh
$912
-
kW-mo/yr
-
TOTAL RECOMMENDED $855,318 $160,842 $661,276
18,170,744
kWh
$163,579
-
kW-mo/yr
$30,463
-
Tgal
TOTAL IMPLEMENTED $376,439 $20 $312,927
8,596,894
kWh
$63,512
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs