ITAC Assessment: AT0001
ITAC logo
ITAC Assessment: AT0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PAINT
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,295
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,621 2,311,254
kWh
Natural Gas $76,490 11,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,774

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $3,819 $4,000 $3,819
73,857
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,154 $1,114 $1,154
22,274
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,462 $14,608 $1,462
28,136
kWh
-
04 2.2511: Insulate bare equipment $5,546 $4,829 $5,546
106,975
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $114 $150 $114
2,345
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,295 $300 - $2,295
-
MMBtu
TOTAL RECOMMENDED $14,390 $25,001 $12,095
233,587
kWh
$2,295
-
MMBtu
TOTAL IMPLEMENTED $11,774 $9,279 $9,479
183,177
kWh
$2,295
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs