| Assessment Year | 1985 |
|---|---|
| Principal Product | PAINT |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,295
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $119,621 | 2,311,254 |
kWh
|
$0.052 |
| Natural Gas | $76,490 | 11,936 |
MMBtu
|
$6.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,774 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,819 | $4,000 |
$3,819
73,857
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,154 | $1,114 |
$1,154
22,274
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,462 | $14,608 |
$1,462
28,136
kWh
|
- | |
| 04 | 2.2511: Insulate bare equipment | $5,546 | $4,829 |
$5,546
106,975
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $114 | $150 |
$114
2,345
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,295 | $300 | - |
$2,295
-
MMBtu
|
|
| TOTAL RECOMMENDED | $14,390 | $25,001 |
$12,095
233,587
kWh
|
$2,295
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,774 | $9,279 |
$9,479
183,177
kWh
|
$2,295
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs