ITAC Assessment: AS0594
ITAC logo
ITAC Assessment: AS0594
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product delivery services
NAICS 492110: Couriers and Express Delivery Services
SIC 4215: Courier Services, Except by Air
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 120,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 5,012
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,373 831,480
kWh
Electricity Demand $9,711 1,912
kW-mo/yr
Electricity Fees $7,217 -
Fuel Oil #1 $2,952,319 82,698
MMBtu
TOTAL YEARLY COSTS $3,045,620
RECOMMENDED SAVINGS* $559,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Ancillary Material Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $534,062 $3,480,000 $(-110,080.0)
(-1,197,826)
kWh
- $644,142
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $20,609 $18,624 $18,521
201,532
kWh
$1,988
-
kW-mo/yr
- $100
03 2.7261: Install timers and/or thermostats $3,701 $390 $3,701
40,268
kWh
- - -
04 2.7423: Reduce heat gain by window tinting $915 $3,003 $915
9,953
kWh
- - -
TOTAL RECOMMENDED $559,287 $3,502,017 $(-86,943.0)
(-946,073)
kWh
$1,988
-
kW-mo/yr
$644,142
-
MMBtu
$100
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs