Assessment Year | 2022 |
---|---|
Principal Product | Defense Contracting |
NAICS | 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
Sales Range | less than $500 k |
# of Employees | 900 |
Plant Area |
660,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 5,858
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $943,954 | 19,024,134 |
kWh
|
$0.050 |
Electricity Demand | $218,046 | 32,497 |
kW-mo/yr
|
$6.71 |
Electricity Fees | $404,462 | - |
|
- |
Natural Gas | $138,977 | 20,258 |
MMBtu
|
$6.86 |
TOTAL YEARLY COSTS | $1,705,439 | |||
RECOMMENDED SAVINGS* | $236,214 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $90,618 | $28,940 |
$75,897
1,530,162
kWh
|
$14,721
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $63,678 | $302,167 |
$51,528
1,038,807
kWh
|
$21,548
-
kW-mo/yr
|
- | - | - | $(-9,398.0) | |
03 | 2.9114: Use solar heat to make electricty | $44,875 | $580,160 |
$32,767
605,282
kWh
|
$12,108
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1321: Replace fossil fuel equipment with electrical equipment | $15,767 | $43,000 |
$(-1,666.0)
(-33,580)
kWh
|
- | - |
$17,433
-
MMBtu
|
- | - | |
05 | 3.5316: Contract a wood pallet recycling company | $11,700 | $453 | - | - | - | - | - | $11,700 | |
06 | 2.4156: Establish a preventative maintenance program | $6,454 | $122 |
$22,321
450,017
kWh
|
$4,133
-
kW-mo/yr
|
- | - | $(-20,000.0) | - | |
07 | 2.7135: Install occupancy sensors | $1,979 | $1,772 |
$1,643
33,126
kWh
|
$336
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,143 | $411 | - | - |
$1,578
-
MMBtu
|
- | $(-435.0) | - | |
TOTAL RECOMMENDED | $236,214 | $957,025 |
$182,490
3,623,814
kWh
|
$52,846
-
kW-mo/yr
|
$1,578
-
MMBtu
|
$17,433
-
MMBtu
|
$(-20,435.0) | $2,302 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs