ITAC Assessment: AS0513
ITAC logo
ITAC Assessment: AS0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Defense Contracting
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range less than $500
k
# of Employees 900
Plant Area 660,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,858
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $943,954 19,024,134
kWh
Electricity Demand $218,046 32,497
kW-mo/yr
Electricity Fees $404,462 -
Natural Gas $138,977 20,258
MMBtu
TOTAL YEARLY COSTS $1,705,439
RECOMMENDED SAVINGS* $236,214 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $90,618 $28,940 $75,897
1,530,162
kWh
$14,721
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $63,678 $302,167 $51,528
1,038,807
kWh
$21,548
-
kW-mo/yr
- - - $(-9,398.0)
03 2.9114: Use solar heat to make electricty $44,875 $580,160 $32,767
605,282
kWh
$12,108
-
kW-mo/yr
- - - -
04 2.1321: Replace fossil fuel equipment with electrical equipment $15,767 $43,000 $(-1,666.0)
(-33,580)
kWh
- - $17,433
-
MMBtu
- -
05 3.5316: Contract a wood pallet recycling company $11,700 $453 - - - - - $11,700
06 2.4156: Establish a preventative maintenance program $6,454 $122 $22,321
450,017
kWh
$4,133
-
kW-mo/yr
- - $(-20,000.0) -
07 2.7135: Install occupancy sensors $1,979 $1,772 $1,643
33,126
kWh
$336
-
kW-mo/yr
- - - -
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,143 $411 - - $1,578
-
MMBtu
- $(-435.0) -
TOTAL RECOMMENDED $236,214 $957,025 $182,490
3,623,814
kWh
$52,846
-
kW-mo/yr
$1,578
-
MMBtu
$17,433
-
MMBtu
$(-20,435.0) $2,302
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs