ITAC Assessment: AS0490
ITAC logo
ITAC Assessment: AS0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Bakery Products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 77
Plant Area 42,000
ft2
Annual Production 1,300,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,223 1,051,920
kWh
Electricity Demand $39,992 4,184
kW-mo/yr
Electricity Fees $24,643 -
Natural Gas $85,451 14,943
MMBtu
Waste Disposal Costs
Water Usage $27,120 4,502
Tgal
TOTAL YEARLY COSTS $221,429
RECOMMENDED SAVINGS* $11,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,708 $1,550 $2,457
53,411
kWh
$1,251
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $3,534 $3,368 $2,332
50,710
kWh
$1,202
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,729 $410 - - $3,209
-
MMBtu
$(-480.0) -
04 2.6125: Keep equipment clean $991 $464 $991
21,543
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $891 $397 $159
3,454
kWh
$81
-
kW-mo/yr
- - $651
TOTAL RECOMMENDED $11,853 $6,189 $5,939
129,118
kWh
$2,534
-
kW-mo/yr
$3,209
-
MMBtu
$(-480.0) $651
TOTAL IMPLEMENTED $8,145 $4,639 $3,482
75,707
kWh
$1,283
-
kW-mo/yr
$3,209
-
MMBtu
$(-480.0) $651
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs