ITAC Assessment: AS0482
ITAC logo
ITAC Assessment: AS0482
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Cement/Ready Mix Concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range less than $500
k
# of Employees 30
Plant Area 2,000
ft2
Annual Production 60,500
units
Production Hrs. Annual 3,484
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,914 617,692
kWh
Electricity Demand $27,132 3,166
kW-mo/yr
Electricity Fees $3,464 -
Other Energy $455,131 23,153
MMBtu
Waste Disposal Costs
Water Usage $60,164 11,287
Tgal
TOTAL YEARLY COSTS $586,805
RECOMMENDED SAVINGS* $22,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $11,090 $200 - - $11,090
02 2.8112: Combine utility meters $5,394 $416 - - $5,394
03 2.6231: Utilize controls to operate equipment only when needed $4,701 $160 $4,418
66,744
kWh
$283
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,040 $1,459 $731
10,452
kWh
$309
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,225 $2,235 $5,149
77,196
kWh
$592
-
kW-mo/yr
$16,484
TOTAL IMPLEMENTED $16,831 $1,819 $5,149
77,196
kWh
$592
-
kW-mo/yr
$11,090
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs