ITAC Assessment: BD0434
ITAC logo
ITAC Assessment: BD0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Engineering services
NAICS 541330: Engineering Services
SIC 8711: Engineering Services
Sales Range $500
k
to 1
M
# of Employees 350
Plant Area 64,808
ft2
Annual Production 0
units
Production Hrs. Annual 3,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,944 2,387,428
kWh
Electricity Demand $37,423 5,951
kW-mo/yr
Electricity Fees $8,598 -
Fuel Oil #2 $66,351 2,940
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $48,621 $13,862 - - $(-17,730.0)
-
MMBtu
$66,351
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $17,169 $11,159 $11,981
301,052
kWh
$5,188
-
kW-mo/yr
- - - -
03 2.1213: Direct warmest air to combustion intake $15,503 $11,000 $229
5,760
kWh
$76
-
kW-mo/yr
- $15,198
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,463 $1,425 $649
16,311
kWh
$140
-
kW-mo/yr
- - $282 $392
05 2.7135: Install occupancy sensors $1,272 $1,475 $1,272
31,955
kWh
- - - - -
TOTAL RECOMMENDED $84,028 $38,921 $14,131
355,078
kWh
$5,404
-
kW-mo/yr
$(-17,730.0)
-
MMBtu
$81,549
-
MMBtu
$282 $392
TOTAL IMPLEMENTED $68,525 $27,921 $13,902
349,318
kWh
$5,328
-
kW-mo/yr
$(-17,730.0)
-
MMBtu
$66,351
-
MMBtu
$282 $392
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs