ITAC Assessment: AS0480
ITAC logo
ITAC Assessment: AS0480
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Coated Paper Bags
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range less than $500
k
# of Employees 60
Plant Area 100,000
ft2
Annual Production 2,130,000,000
pieces
Production Hrs. Annual 8,520
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,802 4,745,859
kWh
Electricity Demand $59,151 7,609
kW-mo/yr
Electricity Fees $9,036 -
TOTAL YEARLY COSTS $338,989
RECOMMENDED SAVINGS* $38,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,036

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4226: Use / purchase optimum sized compressor $17,992 $66,000 $15,210
266,842
kWh
$2,782
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,276 $9,045 $8,691
152,481
kWh
$1,585
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,044 $9,363 $6,747
118,368
kWh
$1,297
-
kW-mo/yr
04 2.7232: Replace existing hvac unit with high efficiency model $1,442 $5,500 $968
16,994
kWh
$474
-
kW-mo/yr
05 2.7135: Install occupancy sensors $605 $2,300 $605
10,612
kWh
-
TOTAL RECOMMENDED $38,359 $92,208 $32,221
565,297
kWh
$6,138
-
kW-mo/yr
TOTAL IMPLEMENTED $26,036 $75,363 $21,957
385,210
kWh
$4,079
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs