ITAC Assessment: AS0474
ITAC logo
ITAC Assessment: AS0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Aircraft parts & auxiliary equipment
NAICS 336411: Aircraft Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 50,000
ft2
Annual Production 240,000
units
Production Hrs. Annual 3,168
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,485 1,044,160
kWh
Electricity Demand $15,838 2,852
kW-mo/yr
Electricity Fees $7,921 -
Natural Gas $393 21
MMBtu
Waste Disposal Costs
Water Usage $4,911 1,380
Tgal
TOTAL YEARLY COSTS $113,548
RECOMMENDED SAVINGS* $46,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,556

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7241: Install outside air damper / economizer on hvac unit $20,118 $5,404 $16,623
207,782
kWh
$3,495
-
kW-mo/yr
- -
02 3.7198: Reduce / eliminate use of disposable product $9,875 $2,238 - - - $9,875
03 2.7224: Reduce space conditioning during non-working hours $7,733 $750 $6,124
76,551
kWh
$1,609
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,818 $895 - - $4,818 -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,935 $516 $1,580
19,750
kWh
$355
-
kW-mo/yr
- -
06 2.7111: Reduce illumination to minimum necessary levels $1,267 $110 $1,003
12,545
kWh
$264
-
kW-mo/yr
- -
07 2.6211: Conserve energy by efficient use of vending machines $838 $687 $759
9,487
kWh
$79
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $77 - $60
750
kWh
$17
-
kW-mo/yr
- -
TOTAL RECOMMENDED $46,661 $10,600 $26,149
326,865
kWh
$5,819
-
kW-mo/yr
$4,818 $9,875
TOTAL IMPLEMENTED $44,556 $9,803 $24,387
304,833
kWh
$5,476
-
kW-mo/yr
$4,818 $9,875
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs