Assessment Year | 2019 |
---|---|
Principal Product | Furniture |
NAICS | 337121: Upholstered Household Furniture Manufacturing |
SIC | 2512: Wood Household Furniture, Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 85,000
units
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $87,248 | 1,108,200 |
kWh
|
$0.079 | |
Electricity Demand | $24,976 | 4,614 |
kW-mo/yr
|
$5.41 | |
Electricity Fees | $3,293 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $16,711 | 2,237 |
Tgal
|
$7.47 | |
TOTAL YEARLY COSTS | $132,228 | ||||
RECOMMENDED SAVINGS* | $37,075 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $4,945 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $20,498 | $1,790 | - | - | $20,498 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,930 | $5,282 |
$6,896
86,200
kWh
|
$2,034
-
kW-mo/yr
|
- | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $3,599 | $9,044 |
$2,675
33,434
kWh
|
$924
-
kW-mo/yr
|
- | |
04 | 2.4224: Upgrade controls on compressors | $1,975 | $2,120 |
$1,466
18,329
kWh
|
$509
-
kW-mo/yr
|
- | |
05 | 2.7423: Reduce heat gain by window tinting | $727 | $400 |
$540
6,754
kWh
|
$187
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $647 | $2,803 |
$480
6,002
kWh
|
$167
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $699 | $1,891 |
$519
6,493
kWh
|
$180
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $37,075 | $23,330 |
$12,576
157,212
kWh
|
$4,001
-
kW-mo/yr
|
$20,498 | ||
TOTAL IMPLEMENTED | $4,945 | $13,738 |
$3,674
45,929
kWh
|
$1,271
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs