ITAC Assessment: AS0473
ITAC logo
ITAC Assessment: AS0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 85,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,248 1,108,200
kWh
Electricity Demand $24,976 4,614
kW-mo/yr
Electricity Fees $3,293 -
Waste Disposal Costs
Water Usage $16,711 2,237
Tgal
TOTAL YEARLY COSTS $132,228
RECOMMENDED SAVINGS* $37,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $20,498 $1,790 - - $20,498
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,930 $5,282 $6,896
86,200
kWh
$2,034
-
kW-mo/yr
-
03 2.7241: Install outside air damper / economizer on hvac unit $3,599 $9,044 $2,675
33,434
kWh
$924
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $1,975 $2,120 $1,466
18,329
kWh
$509
-
kW-mo/yr
-
05 2.7423: Reduce heat gain by window tinting $727 $400 $540
6,754
kWh
$187
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $647 $2,803 $480
6,002
kWh
$167
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $699 $1,891 $519
6,493
kWh
$180
-
kW-mo/yr
-
TOTAL RECOMMENDED $37,075 $23,330 $12,576
157,212
kWh
$4,001
-
kW-mo/yr
$20,498
TOTAL IMPLEMENTED $4,945 $13,738 $3,674
45,929
kWh
$1,271
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs